Media asset · MED-034

Infographic: what the estimate covers

As of

What the €7.9–8.9 billion estimate covers — as far as we know

Stated

Not stated whether included

  • Land and expropriations
  • Relocating the military firing range
  • The airport rail link
  • The Third Tagus Crossing
  • Regional road schemes
  • Financing costs and interest
  • Inflation after 2024
  • Contingency

Separate figures on record

We do not add these figures together: they have different scopes and price bases. Data as of 18 October 2026, from the linked records. Graphic: Luís de Camões Airport Observatory (original work).

Record details

Record ID
MED-034
As-of date
First seen by the observatory
Last verified
Kind
Infographic
Permission status
Original work of the observatory
Copyright owner
Luís de Camões Airport Observatory
Creator
Luís de Camões Airport Observatory
Design vintage
Not a design image
Built-in infographic (original, generated from the records)
What the €7.9–8.9 billion estimate covers — as far as we know

Verification

Fact-check stage
Source checked
Last verified
How it was checked
Generated from the published records; numbers and statuses update with them.

Report an error in this record