Environmental assessment

A 5,000-page study is with the Portuguese Environment Agency. On 18 October 2026 the public register still showed no consultation dates and no decision.

Facts on this page as of · Corrections

Timber-clad visitor building on stilts among flat green wetland under a clear sky.
“Rede Natura 2000 – Sítio do Estuário do Tejo 09”, © Joao 1968, CC BY-SA 3.0, via Wikimedia Commons. Resized to 1,600 px wide. About this image

ANA delivered the final environmental impact study to APA on 31 July 2026, after 18 months of work by more than 60 specialists. It covers water resources, noise, ecology, air quality, population health and socioeconomics, and proposes minimisation and compensation measures.

APA’s register for process AIA 3982 names ANA as proponent, the Ministry of Infrastructure and Housing as licensing authority and Benavente and Montijo as municipalities. The consultation and decision fields were empty when we checked. That is what the register shows; it is not proof that nothing has happened elsewhere.

An earlier Alcochete solution received a conditional favourable declaration in 2010. That declaration has lapsed and does not cover today’s design.

The environmental impact study in numbers

Printed single-sided, the study would make a pile about 50 cm high (at 0.1 mm a sheet).

  1. Study delivered
  2. APA checks it is complete
  3. Public consultation
  4. Environmental decision (DIA)
Size is not quality: what matters is what the study finds and how APA and the public assess it. Data as of 18 October 2026, from the linked records. Graphic: Luís de Camões Airport Observatory (original work).

Illustration — not to scale, not the airport design

Flamingos and egrets on the Tagus mudflats, one of Europe's most important wetlands for birds.

Illustration: Luís de Camões Airport Observatory (original work).

What the documents say

Open questions

  1. When will the public consultation on the environmental study open, and will all volumes be downloadable?

    Open

    Why it matters

    The consultation is the public's formal chance to comment on noise, water, ecology and health impacts.

    What is known so far

    The study was delivered on 31 July 2026. APA's register showed no consultation dates on 18 October 2026.

    Source: Agência Portuguesa do Ambiente (SIAIA) Source: ANA – Aeroportos de Portugal (VINCI Airports)

  2. What mitigation and compensation measures does the environmental study propose?

    Open

    Why it matters

    These measures, and any conditions APA attaches, define the airport's environmental footprint.

    What is known so far

    ANA says measures were identified to ensure an environmentally viable project. Their content has not been reviewed by the observatory.

    Source: ANA – Aeroportos de Portugal (VINCI Airports)

  3. How will water, fuel and power reach the airport?

    Open

    Why it matters

    Supply networks can have their own environmental and community impacts.

    What is known so far

    Planning of water, fuel, electricity and telecoms supply is listed among preparatory actions; no project details were found.

    Source: ANA – Aeroportos de Portugal (VINCI Airports)

Questions answered

Has the environmental impact assessment been completed?

No. ANA delivered the study to APA on 31 July 2026 (process AIA 3982). On 18 October 2026 the register showed no consultation dates and no decision. No environmental permit should be assumed.

Source: Agência Portuguesa do Ambiente (SIAIA) Source: ANA – Aeroportos de Portugal (VINCI Airports) Permalink: Has the environmental impact assessment been completed?

What does the environmental study cover?

According to ANA: water resources, noise, ecological systems, air quality, population health and socioeconomics, with minimisation and compensation measures. It runs to about 5,000 pages and was prepared by more than 60 specialists over 18 months.

Source: ANA – Aeroportos de Portugal (VINCI Airports) Permalink: What does the environmental study cover?

Can I read the environmental study and comment on it?

Not yet, as far as the public register shows. Public participation happens during APA’s public consultation, whose dates were not set on the register at the baseline date. The observatory will publish the dates when they appear.

Source: Agência Portuguesa do Ambiente (SIAIA) Permalink: Can I read the environmental study and comment on it?

Wasn’t Alcochete already environmentally approved in 2010?

An earlier airport solution there received a conditional favourable environmental declaration in 2010. It has lapsed and does not cover the current design, which is being assessed in its own process.

Source: Portuguese Government (XXV Constitutional Government) Source: Portuguese Government (XXIV Constitutional Government) Permalink: Wasn’t Alcochete already environmentally approved in 2010?

Sources

  1. Tier 2 Company statement · ANA – Aeroportos de Portugal (VINCI Airports) ·

    ANA delivers the environmental impact study for the new Lisbon airport

    Original: ANA delivers the environmental impact study for the new Lisbon airport Link checked

Related explainers