What the €7.9–8.9 billion estimate covers — as far as we know
Stated
- 7,900–8,900 € million — the airport project in ANA’s technical report, at 2024 prices
Not stated whether included
- Land and expropriations
- Relocating the military firing range
- The airport rail link
- The Third Tagus Crossing
- Regional road schemes
- Financing costs and interest
- Inflation after 2024
- Contingency
Separate figures on record
- up to 4.5 € million — demilitarisation works authorised, plus VAT
- about 7,000 € million — debt ANA plans to raise (financing, not an extra cost)
Record details
- Record ID
- MED-034
- As-of date
- First seen by the observatory
- Last verified
- Kind
- Infographic
- Permission status
- Original work of the observatory
- Copyright owner
- Luís de Camões Airport Observatory
- Creator
- Luís de Camões Airport Observatory
- Design vintage
- Not a design image
- Built-in infographic (original, generated from the records)
- What the €7.9–8.9 billion estimate covers — as far as we know
- Topic
- Costs and funding