Chart: how the opening date moved

As of

How the opening date moved

20282029203020312032203320342035203620372038
Reported, unverifiedopening
  • May 2024 plan — first runway: 2030
  • May 2024 plan — second runway: 2031
  • July 2026 schedule — construction: 2029–2033
  • July 2026 schedule — rail link: 2034
  • July 2026 schedule — opening: from 2035
  • Reported, unverified — opening: 2037
A revised target is a change, not by itself evidence of failure. The 2024 dates were for runways; the 2026 dates are for a certified, open airport. Data as of 18 October 2026, from the linked records. Graphic: Luís de Camões Airport Observatory (original work).

Record details

Record ID
MED-032
As-of date
First seen by the observatory
Last verified
Kind
Infographic
Permission status
Original work of the observatory
Copyright owner
Luís de Camões Airport Observatory
Creator
Luís de Camões Airport Observatory
Design vintage
Not a design image
Built-in infographic (original, generated from the records)
How the opening date moved

Verification

Fact-check stage
Source checked
Last verified
How it was checked
Generated from the published records; numbers and statuses update with them.

Report an error in this record